Core Knowledge / Open Ended Questions removed from CCIE Storage Lab
Recent Posts
See AllOne issue to be mindful of when configuring Cisco MDS switches with Brocade switches is that Brocades Per VC Flow Control must be...
At 1Gbps a FC frame is 4km long, at 2Gbps a frame is 2km long, and at 4Gbps a frame is 1km long. A 10km cable is 20km round trip. Round...
Comments